Home
Contact Us
Latest News
Login
Find a Home
Where We Build
F.A.Q.
About Us
Financial
save your favorite home and request further information
Establish your personal Garden Homes Portfolio
create an account
already a garden homes user? LOGIN
User ID:
Password:
Remember me:
forgot your password?
Contact a Consultant About This Community
Contact
Community Info
Model Home
Area Info
Lot Map
Lot Prices
Directions
Membership Gift
Printable Items
Site Restrictions
Design Standards
Purchase Agreement Form
Included List
Sample Forms
1 Year Limited Warranty
Site Inspection Request
Site Inspection Form
Settlement Statement
Truth-in-Lending Form
Good Faith Estimate Form
Realtor Friendly
2007 Spring Builder's Showcase, May 12 -20
January 24, 2007
Lot at Purchase
January 25, 2007
Digging the Foundation
January 26, 2007
Poured Footings
(Covered with straw to protect from freezing.)
January 29, 2007
Stripping the Footings
January 31, 2007
Setting Basement Wall Forms - 8" of snow, 9 degrees
"YES, WE CAN BUILD IN THE WINTER!!!"
February 1, 2007
Pouring Basement Walls
Reached minimum high of 20 degrees today, which allowed us to pour with special concrete.
February 2, 2007
Poured Basement Walls
February 8, 2007
Joist System
February 11, 2007
Laying Deck on Joist System
February 15, 2007
Damproofing the foundation walls
February 15, 2007
Setting the exterior walls
February 17, 2007
Setting the interior walls
February 19, 2007
Backfill the House
February 19, 2007
Setting the interior and exterior walls
February 20, 2007
OSB Wall Sheathing
February 22, 2007
Applied Tyvek Wrap as a Water and Wind Barrier
February 22, 2007
Setting Trusses
February 22, 2007
Setting Trusses with a crane
February 23, 2007
Finished Setting Trusses
March 06, 2007
Basement underground before pouring cement floor:
Sump Baskets, Floor Drain, Rough Basement Bath
March 06, 2007
Roof decking and Ice/Water Shield
March 06, 2007
Roof decking and Ice/Water Shield
March 07, 2007
Installed Pella Windows and Glass Block in Master Bathroom
March 15, 2007
Tray ceiling in master bedroom
March 15, 2007
Installing heat ducts in basement.
March 15, 2007
Installing security system
March 15, 2007
Great Room coffered ceiling and beams.
March 15, 2007
Laying Shingles
March 15, 2007
Electrician installing interior CAD lights.
March 15, 2007
Electrician installing exterior CAN lights.
March 21, 2007
Breakfast Area
March 21, 2007
Gas Fireplace Rough-in
March 22, 2007
Tyvek House wrap with blue rubberized sealer around all windows and doors.
March 22, 2007
All work done to this point with no electric hookups.
March 22, 2007
Plumbing, wiring, heating, and structural rough inspections.
March 22, 2007
Water line to refrigerator icemaker with expansion chamber.
March 22, 2007
Holes in plates filled with fire retardent draft stops.
March 22, 2007
Laundry room dryer hookup.
March 22, 2007
Laundry room washer hook-ups with expansion chamber on water lines.
March 22, 2007
Attic Ventilation and Draft Stops
March 23, 2007
Sound deadning insulation around all bathrooms.
March 26, 2007
Exterior walls blown celulose fiber insulation with poly vapor barrier.
March 23, 2007
Finished wet seal insulation, attic ventilation, and draft stops
March 26, 2007
Sheet Rock Delivery
March 29, 2007
Hanging Sheetrock
March 29, 2007
Hanging Sheetrock
March 30, 2007
Preparing to set front porch concrete.
March 30, 2007
Installing soffit and facia
March 30, 2007
Installing soffit and facia
March 30, 2007
Installing Cedar Siding
April 03, 2007
Taping Drywall
April 10, 2007
Masonry - Laying Stone
April 13, 2007
Painting
April 13, 2007
Laying Floor Tile
April 17, 2007
Muriatic Acid Washing Masonry
April 19, 2007
Sewer and Water
April 19, 2007
Installing Interior Doors
April 22, 2007
All Concrete is drilled and bound to each other
April 24, 2007
Poured Concrete Driveway
April 24, 2007
Protecting Siding from Concrete Splash
April 26, 2007
Finishing Electrical
April 26, 2007
Sewing Carpet
April 30, 2007
Installing Sprinkler System
April 30, 2007
Window Washing
April 30, 2007
Starting Landscaping
April 30, 2007
Rock Retaining Walls
April 30, 2007
Laying Hardwood
April 30, 2007
Installing Light Fixtures
April 30, 2007
Ceramic Tile in Master Bath
April 30, 2007
Wallpaper in Master Bath
April 30, 2007
Landscaping - Laying Sod and Mulch
April 30, 2007
Painting Outside Trim
May 08, 2007
Blow Door Test - Testing for Energy Star